Stratsmith

STAFF AUGMENTATION | custom software development

Expanding Software Delivery Capabilities Through Application Development Staff Augmentation

Stratsmith used application development staff augmentation to support a custom software development company in it services / software development over a year. The staff augmentation engagement improved team build speed from 12 weeks to 7 weeks, raised accuracy / quality from 92 % to 96 %, and returned leadership capacity to the CEO.

Company type

A custom software development company

Headquarters

US, UK, Australia, Canada

Department served

Web Development, Mobile Development, Backend Engineering, QA, UI/UX

Decision-maker

CEO, CTO, Delivery Director, Project Manager

Industry 

IT Services / Software Development

Company size

20-150

Overview

Increasing delivery capacity without adding a full local team or weakening quality control

£49,370

cost-per-fte savings, from £81,370

4 weeks

team build speed, from 9 weeks

4 hours per week

leadership bandwidth impact, from 10 hours per week

The client was a custom software development company serving customers in it services / software development. Its teams covered web development, mobile development, backend engineering, qa, ui/ux. Demand had grown faster than the internal operating model could absorb, so routine work and decision-making were increasingly concentrated in the ceo, cto, delivery director, project manager. That concentration made performance dependent on a small number of experienced people and left less room to absorb the next increase in volume.

The business needed a practical way to add capability without losing visibility over the work. The trigger was a combination of higher volume, tighter delivery expectations, and the need to protect senior time for quality review and business priorities. The decision therefore depended on more than adding people. It required a defined scope, a measurable handoff, and a governance routine that could be maintained after launch. Those controls were part of the operating model from the start.

Problem

The client had a skills gap that was slowing delivery while permanent hiring remained uncertain

The growing project pipeline was stretching the company’s existing development capacity across web development, mobile development, backend engineering, QA, and UI/UX. Without additional support, active projects risked facing delivery delays, increased workloads, and inconsistent resource allocation. With technical decisions and project oversight concentrated among the CEO, CTO, delivery director, and project manager, senior involvement in routine execution would have remained high. This would have left less time for client relationships, technical direction, and business growth while making delivery schedules and project planning harder to manage.

  • £81,397 FTE PA

    Comparable delivery cost was £81,397 per FTE per year.

  • 12 weeks

    Building a complete team took 12 weeks from approved requirement to active delivery.

  • 92 % First pass accuracy

    First-pass delivery quality was 92 % against the agreed review standard.

  • 10 weeks

    New team members needed 10 weeks to reach the agreed productivity threshold.

  • 13 hours

    The decision-maker spent 13 hours each week on staffing coordination and delivery escalations.

Why us

Why the Client Chose Stratsmith

Clear role ownership

Stratsmith could provide react, node.js, python, .net, java and mobile developers with clear role ownership and a measurable launch sequence.

Defined scope

The operating model addressed the cost constraint through a defined scope and an agreed review boundary, rather than treating price as the only measure.

Documented checklists

Documented checklists, reporting cadence, and escalation paths created control over quality while the delivery team handled repeatable work.

Staged workflow

A staged workflow gave the ceo visibility into queue status, exceptions, and decisions that still required client ownership.

Adaptable model

The model could flex around demand without requiring the client to redesign its operating structure for every new volume peak.

Solution

A governed offshore accounting delivery pod

Built the role-matched delivery team

Stratsmith staffed a delivery manager, senior specialists, and role-matched delivery professionals around the client’s web development, mobile development, backend engineering, qa, ui/ux. Each role had a defined queue, approval boundary, and escalation path. This solved the cost and capacity constraint by matching the team to the work actually required. The client retained ownership of customer-facing judgment while the delivery team handled the agreed production scope. Comparable delivery cost fell from £81,397 to £47,397 per FTE per year.

£81,397 to £47,397
Standardized the core workflow

The team converted the main workflow into a shared sequence covering intake, processing, review, exceptions, and handoff. The sequence made dependencies visible and gave the client a consistent point at which to review open issues. This addressed the speed constraint without removing client visibility. Team build speed improved from 12 to 7 weeks.

12 to 7 weeks
Added quality controls and measurable handoffs

Stratsmith introduced role-based checklists, an exception log, and a review sample agreed with the client. The control layer addressed quality and rework while keeping final client decisions in the client’s team. Each handoff had a named owner, a completion rule, and a route for items outside the agreed scope. First-pass quality rose from 91.7% to 95.9%.

Accuracy rose from 92 % to 96 %
Established governance and reporting cadence

Stratsmith ran a launch check-in, a weekly service review, and a monthly performance review covering the agreed KPIs. Access, working papers, and escalation evidence were controlled as operational practices. The review cadence also gave the client a point to adjust the queue, role mix, or priority order as demand changed. Leadership time fell from 13 to 7 hours per week.

13 to 7 hours per week
Before and after, measured across the engagement

Impact Delivered 

Cost-per-FTE Savings

From £81,397 loaded annual to £47,397loaded annual delivery cost per FTE.

£81,397 to £47,397
Team Build Speed

From 12 weeks to 7 weeks.

12 weeks to 7 weeks
Accuracy / Quality

From 92 % to 96 %.

+4 %
Time-to-Productivity

From 10 weeks to 6 weeks.

4 weeks saved
Leadership Bandwidth Impact

From 13 hours per week to 7 hours per week.

6 hours saved
Monthly delivery work items
+15 items

From 29 items to 44 items.

+15 items

Higher account growth, and higher-value review work.

+6 hours

For the leadership.

Outcome

Outcome Summary

The engagement gave the client a clearer way to add capability without allowing routine work to crowd out the priorities of the ceo. The measured improvement in team build speed and accuracy / quality created a more predictable operating baseline.

The durable advantage was a repeatable model for managing web development, mobile development, backend engineering, qa, ui/ux. Work could be assigned by role, reviewed through a shared cadence, and expanded when demand justified it. That reduced dependence on informal coordination and made the next growth decision easier to evaluate. The measures were reviewed against the same scope and time window so the result could be managed as an operating metric rather than a one-time event.

If your organisation is facing a similar constraint, Stratsmith can provide a workforce capacity assessment covering role mix, scope, operating controls, and the next practical decision gate.

Scroll to Top